Laserfiche WebLink
Department of Public Works <br /> S A N J O A Q U I N Kris Bala i Director of Public Works <br /> COUNTY i, <br /> Fritz Buchman,Deputy Director/Development <br /> Greatness grows here. Alex Chetley,Interim Deputy Director/Engineering <br /> Jim Stone,Deputy DirectorlOperations <br /> August 16, 2019 Kristi Rhea,Manager of Strategic Initiatives <br /> RFECED ED <br /> MEMORANDUM <br /> TO: Community Development Department Sip 1 2075 <br /> CONTACT PERSON:Alisa Goulart San Joaquin County <br /> FROM: Awni Taha, Interim Engineering Services Manager A-r Community Development <br /> Development Services Division <br /> SUBJECT: PA-1900092;A Minor Subdivision application with a Vesting Tentative Map that <br /> proposes to subdivide a 0.94 acre parcel into two(2)separate parcels. Each parcel will <br /> have an area of 0.47 acres and each parcel has an existing single family residence; located <br /> on the east side of South Mourfield Avenue, 830 feet south of West Clayton Avenue, <br /> Stockton. (Supervisorial District 1) <br /> PROPERTY OWNER: Corey&Tru Lee APPLICANT: Welty Engineering, Inc. <br /> ADDRESS: 3858 S. Mourfield Avenue, Stockton APN: 175-240-27 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> South Mourfield Avenue has an existing right-of-way width of 40 feet and a planned right-of-way width <br /> of 50 feet. <br /> The Trak Impact Mitigation Fee shall be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed.The fee is due and <br /> payable at the time of building permit application. <br /> The Water Impact Mitigation Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. An Irrevocable Offer to Dedicate Road to result in a twenty-five(25)foot wide right-of-way from <br /> the centerline of Mourfield Avenue to the property line shall be required across the frontage of both <br /> parcels. The irrevocable Offer of Dedication shall be made on the Parcel Map. (Development Title <br /> Section 9-1150.5 (b)) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> 91 Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />