Laserfiche WebLink
Community Development Department <br /> PA-1800253 (DV) &PA-1800254(SA) <br /> maintenance of any system installed unless the system is accepted for maintenance by a government <br /> agency. <br /> f. Owner shall be responsible for providing the County with an annual report of operation and .maintenance <br /> of any system.The property owner shall also be responsible for the payment to the County of an annual <br /> system inspection fee established by Resolution of the Board of Supervisors. <br /> g. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement with San <br /> Joaquin County shall be required for the owner/operator of stormwater controls prior to the release of <br /> the building permit. <br /> h. Standard Best Management Practices,for the type of development proposed,shall be incorporated <br /> into the site design storm drainage design. <br /> i. Wastewater shall not be allowed in the storm drainage system. <br /> 8. It is the responsibility of the applicant to ensure that a current will serve letter for sanitary sewer, stormwater and <br /> water service is on file prior to release of building permit. The applicant or subsequent owner of the property is <br /> responsible to ensure there is capacity in the system and that all requirements for the connections are fulfilled <br /> prior to release of the building permit. If any extension,connection, or placement of new facilities is required to <br /> connect to the existing main lines,the cost shall be borne by the applicant. For any work within the County <br /> right-of-way,an improvement plan shall be submitted to Public Works for review and approval. Required plan <br /> check and inspection fees shall apply. <br /> 9. The frontage improvements for Shasta Avenue and Viola Avenue shall be constructed in conformance with the <br /> standards for one-half of a 40-foot right-of-way commercial/industrial street. The construction of the frontage <br /> improvements will be deferred upon execution by the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway Improvement Agreement with a deposit equivalent to <br /> their estimated construction costs prior to approval of the Improvement Plan. (A fee based on the current fee <br /> schedule is required for processing per Development Title Table 9-240.2 in addition to a copy of the Grant Deed <br /> and a legal description of the parcel for the.required frontage improvements. The estimate shall be prepared by a <br /> registered civil engineer with a typical section drawing on a form to be supplied by the Department of Public <br /> Works for approval. As an option,the Department of Public Works will prepare the drawing and estimate for an <br /> additional fee.) (Development Title Section 9-1150.2) <br /> AT:CH <br />