My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012540
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2900
>
2600 - Land Use Program
>
PA-1800254
>
SU0012540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:17:22 AM
Creation date
11/6/2019 9:06:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012540
PE
2631
FACILITY_NAME
PA-1800254
STREET_NUMBER
2900
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205-
APN
14342050, 14342051, 14342053
ENTERED_DATE
9/9/2019 12:00:00 AM
SITE_LOCATION
2900 E FREMONT ST
RECEIVED_DATE
9/6/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Development Department <br /> PA-1800253 (DV) &PA-1800254(SA) <br /> maintenance of any system installed unless the system is accepted for maintenance by a government <br /> agency. <br /> f. Owner shall be responsible for providing the County with an annual report of operation and .maintenance <br /> of any system.The property owner shall also be responsible for the payment to the County of an annual <br /> system inspection fee established by Resolution of the Board of Supervisors. <br /> g. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement with San <br /> Joaquin County shall be required for the owner/operator of stormwater controls prior to the release of <br /> the building permit. <br /> h. Standard Best Management Practices,for the type of development proposed,shall be incorporated <br /> into the site design storm drainage design. <br /> i. Wastewater shall not be allowed in the storm drainage system. <br /> 8. It is the responsibility of the applicant to ensure that a current will serve letter for sanitary sewer, stormwater and <br /> water service is on file prior to release of building permit. The applicant or subsequent owner of the property is <br /> responsible to ensure there is capacity in the system and that all requirements for the connections are fulfilled <br /> prior to release of the building permit. If any extension,connection, or placement of new facilities is required to <br /> connect to the existing main lines,the cost shall be borne by the applicant. For any work within the County <br /> right-of-way,an improvement plan shall be submitted to Public Works for review and approval. Required plan <br /> check and inspection fees shall apply. <br /> 9. The frontage improvements for Shasta Avenue and Viola Avenue shall be constructed in conformance with the <br /> standards for one-half of a 40-foot right-of-way commercial/industrial street. The construction of the frontage <br /> improvements will be deferred upon execution by the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway Improvement Agreement with a deposit equivalent to <br /> their estimated construction costs prior to approval of the Improvement Plan. (A fee based on the current fee <br /> schedule is required for processing per Development Title Table 9-240.2 in addition to a copy of the Grant Deed <br /> and a legal description of the parcel for the.required frontage improvements. The estimate shall be prepared by a <br /> registered civil engineer with a typical section drawing on a form to be supplied by the Department of Public <br /> Works for approval. As an option,the Department of Public Works will prepare the drawing and estimate for an <br /> additional fee.) (Development Title Section 9-1150.2) <br /> AT:CH <br />
The URL can be used to link to this page
Your browser does not support the video tag.