Laserfiche WebLink
2-21-1996 10:A2AM FROM AGE NC 209 956 0700 P' 2 <br /> 5 <br /> DRAFT <br /> analyzed for TPH as gasoline and BTE&X in accordance with approved EPA methods. <br /> These samples will be important in correlating PID readings and determining clean-up <br /> levels. <br /> A log book will be stored at the site for all monitoring and maintenance activities.This boot; <br /> will document all pertinent data for the project including engine running time,vapor Sow, <br /> PID readings, engine coolant levels, blower pressure levels and supplemental fuel <br /> consumption (if possible)- <br /> 3.7 Estimates! Clean-up Time <br /> Using information in the PAR, we estimate that approximately 200 gallons of petroleum <br /> hydrocarbons (gasoline) remains in the soil at the site. Based upon a very conservative <br /> recovery rate of 4 kg/day, we estimate a clew-up time of approximately 6 months (the <br /> theoretical limits of a vapor extraction system is up to 890 kglday in ideal conditions). <br /> After six months or when the efficiency of the unit has declined, an evaluation of the <br /> remediation system will be made.The evaluation will be made using FID data,soil samples, <br /> vapor samples and supplemental fuel costs.A remmmendation will be made for either site <br /> closure (soil) or continuation with remediation. If remediation is continued, additional <br /> recommendations for either continuation with the VACLEEN system or an alternate system <br /> will be made. <br /> 3.8 Confirmation Borings <br /> When the projected six-month clean-up period has been completed,or efficiency of the unit <br /> has declined, one or two soil borings will be drilled within the projected contamination <br /> plume to determine if significant soil contamination renYains.The approadmate locations of <br /> the borings are depicted on Figure 6. <br /> The borings will be drilled with a truck-mounted, hollow stem auger drill rig. The borings <br /> will be drilled to groundwater(approximately 60 feet).Soil samples will be collected at five- <br /> foot intervals using a split-spoon sampler.The sampler will be loaded with three clean,2 by <br /> 6 -inch brass sleeves. Samples will be screened in the field using a PID. <br /> Selected samples will be transported under chain-of custody to a state-certi5ed laboratory <br /> for analysis. The samples will be analyzed for TPH as gasoline and BTE&X in accordance <br /> with approved EPA methods. These samples will be used for site-closure determination. <br /> If remediation is continued beyond the projected six-month period, at Ieast one additional <br /> soil boring will be drilled after each six months of remediation system operation. <br /> o-W..„.&- I... <br /> 8 <br />