My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
3500 - Local Oversight Program
>
PR0544962
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:39:27 AM
Creation date
11/6/2019 9:15:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544962
PE
3528
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced f »�_Tij <br /> GeoEnvironmen.taly 4TW 01 =�: <br /> o l'Nortlrerii Cali/r)rriicr <br /> 5 May 1995 <br /> AGE-NC-95-0112 <br /> iI <br /> Ms. Mary Meays <br /> San Joaquin County PI=IS/I 11D <br /> P. O. Box 3qS ;� <br /> 95 2(11. <br /> Subject: Installation of Remediation System CD <br /> Art & Artists -` <br /> 204 East Lodi Avenue, Lodi, California <br /> Dear Nis. Meal's: <br /> Advanced GeoEnvironmental, Inc. (AGE) is presently preparing for installation of the <br /> proposed vapor extraction/air sparging system at the referenced site. Initial work to be <br /> completed includes the installation of two air sparging wells at the site. We would like to <br /> schedule the drilling to commence oil 11 May 1995. A drilling permit and permit fee is <br /> included. <br /> The following is a proposed schedule for the installation of the system: <br /> ►11, 12 May 1995 Installation of two air sparging wells- <br /> b-15 Mav - 5 June 1995 lnstaliriti<>ll of valor extraction piping, air sparging piping. <br /> 1-6 June - 20 June 1995 Installation of vapor extraction unit. <br /> ►21 June 1995 Vapor extraction unit start-up procedures; bring unit on-line. <br /> ►5 July 1995 Vapor extraction unit should be operating 24-hour/day. <br /> 11-December 1995 Drilling of initial progress soil boring(s). <br /> Progress and data collected from the vapor extraction project will be reported in quarterly <br /> reports. The next quarterly report will be completed by 15 June 1995 and will include <br /> details of installation and start-up procedures to (late. <br /> I'it)" 1\'t,I IMiII 'II I.,ITIC, --StIiIC A. til I CaIifofflitL 95207 <br /> k!]1 ,pho nc ( (H� 1)1 f0-O'61 J 1X (�(),)t�)5fi-fl?1111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.