My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
3500 - Local Oversight Program
>
PR0544962
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:34:10 AM
Creation date
11/6/2019 9:27:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544962
PE
3528
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . <br /> � k <br /> x <br /> S <br /> INTERIM REMEDIAL W RKPLAN <br /> Arts and Arti*ts <br /> 204 East Lodi Ave. <br /> INTRODUCTION <br /> In accordance with a request by Ms. nary Lehr, 4eological Audit � <br /> services, Inc. (GeoAudit) has prepared:this work pian to install a � <br /> vadose zone remediation well on the pioperty loedted at 204 East ( , <br /> Lodi Avenue in Lodi, California (the s*te) <br /> x <br /> BACKGROUND ; ' <br /> The site is located in a flat commerci1 area ,in central 'Lodi.. It <br /> is our understanding that a 550-gallon undergroUhd fuel storage Z <br /> tank containing leaded gasoline was removed by Thorpe 011 Co. in <br /> JaAU.ary, .1967, and that soil samples gollected at that time were <br /> contaminated. Three groundwater monitoring wells wore installed in � <br /> August 1967, and all showed evidence: of contamilbation. By latke' s <br /> 1991, two of these wells had gone dry, and were- replaced b_ji two new i <br /> wells in May 1992 . Three additional wells (MW-6 tli. ough XW-8) were <br /> completed in May 1993. Figure Z shows the location: of all wells on s'' <br /> the site. The newest wells served to delineate th lateral extent <br /> of groundwater contamination, and additional monitoring wells are � . <br /> not required at. this time. A quarterly monitot-ing program is, : <br /> currently in progress. In dune of 1993, San doag4in: EHDD -approved <br /> the installation of one vadose zone remedial W,0111far the purpose <br /> of conducting a feasibility study o� in-situ uApvr extraction <br /> and/or bioremediation of soil contamination. <br /> In previous drilling at this site, vadose--zone contamination was <br /> detected in only one boring (BIW-1) . This boring io the nearest to <br /> the former tank cavity, which is located inside tpe Art & Artists R <br /> building, soil samples were collected at 5-foot i*tervals in this <br /> boring, but only three were submitted for laboratory analysis. <br /> Gasoline contamination was detected in: all three, which ranged in <br /> depth from to to 4e feet. Groundwater w-as :At1CbtltiEYad at <br /> approximately 50 feet when this boring. was dr 11eo- <br /> 's <br /> - r <br /> PROPOSED WELL <br /> In order to access the contaminated zope beneath the tank cavity, j <br /> GeoAudit proposes to drill a slant boring angled 'Ot approximately <br /> 150 from vertical.. It will be completed as remedial, well RW-1 in .E <br /> accordance with the design shown in Figure 3.. `roe well, will be <br /> located in the alley, approximately 5 feet behind the building. . <br /> This location should provide a 5-foot clearance from existing F <br /> underground utility lines. It will be drilled td a depth of 55' i <br /> feet, terminating at a true vertical depth of 53 ::5 fact, Samples. . <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.