My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT
>
102
>
2900 - Site Mitigation Program
>
PR0544963
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:40:32 AM
Creation date
11/6/2019 9:35:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544963
PE
2952
FACILITY_ID
FA0005498
FACILITY_NAME
MATHESON LODI YARD
STREET_NUMBER
102
Direction
E
STREET_NAME
WALNUT
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
102 E WALNUT ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROGER FOQTT ASSC CIATES, INC, <br /> 1450 Harbor Blvd. Suite G <br /> West Sacramento, A 95691 <br /> ':(916) 325-2580 <br /> FAX, (916) 325--2570 <br /> January 2 , 1991 <br /> 047-004 .HSP <br /> HEALTH AND SAFETY PLAN <br /> FOR THE <br /> ' EVALUATION OF SOIL CONTAMINATION <br /> at <br /> Matheson Freight Facility <br /> 102 East Walnut Street <br /> Lodi , California <br /> INTRODUCTION <br /> This Health and Safety Plan delineates the basic safety <br /> requirements for the evaluation of soil contamination at the <br /> Matheson Fast Freight facility located at 102 East Walnut <br /> Street in Lodi , California . The initial investigation will <br /> include drilling three soil borings to depths of <br /> approximately 10 to 15 feet and collecting soil samples . <br /> 'The borings will be performed within the area of the former <br /> underground storage tank cavity . Subsequent work will <br /> include the excavation and removal of contaminated soil . <br /> The provisions set forth in this Health and Safety Plan <br /> will apply to the employees of Roger Foott Associates, Inc . , <br /> and its subcontractors working orl this project . The <br /> subcontractors may elect to modify these provisions , but <br /> only to upgrade or increase the safety requirements , and <br /> only with • the concurrence of Roger Foott Associates , Inc . , <br /> as designated and accepted .in wr. ting . - <br /> This Health and Safety Plan addresses the expected <br /> potential hazards that may be encountered for this project . <br /> Field activities are planned to legin on January 4 , 1991 , <br /> with the duration estimated at approximately 1 to 2 days . <br /> If changes in site or working con ditions occur as the <br />
The URL can be used to link to this page
Your browser does not support the video tag.