Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br /> 1 <br /> 2.0 BACKGROUND 1 <br /> 2.1 Tank Removal 1 <br /> 2.2 Initial Investigation 1 <br /> 2.3 Initial Monitoring 4 <br /> 2.4 Installation of Monitoring Wells 4 <br />' MW-4 and MW-5 <br /> 2.5 Installation of Monitoring Wells 4 <br /> MW-6, MW-7 and MW-8 5 <br />' 2.6 Quarterly Groundwater Monitoring 5 <br /> 2.7 Installation of Remediation Well RW-1 5 <br /> 2.8 Final Remedial Plan Preparation <br /> 3.0 PROCEDURES 5 <br /> 3.1 Monitoring Well Purge Procedures <br /> 5 <br /> 3.2 Groundwater Sample Collection 6 <br /> 1 <br /> 4.0 FINDINGS 6 <br />' <br /> 4.1 Groundwater Elevation and Gradient 6 <br /> 4.2 Laboratory Analysis of Groundwater Samples 8 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 8 <br /> 5.1 Hydrocarbon Impacted Groundwater 8 <br /> 5.2 Soil and Groundwater Remediation 8 <br /> 6.0 LIMITATIONS 10 <br /> • <br />