Laserfiche WebLink
1 <br /> All work fox this pxaject was performed under the responsible charge of a Registered Geologist. Our <br />' prnfess�oaal services caste promWed sising that degree of carr and'sk [1 ordinarily exercised by <br /> envtron�neatal �consaltanta pradicing to this or similar localities..The findings were mainly based upon . <br /> analytical results provided by as iadepeodet laboratory. Evaluations of.the hydrogeological conditions <br /> at the srte,foX the purpose of this Uweiiigation are;made from a limited number of available data <br /> pool ts, and subsurface candttions mar vary away from.these darn`points.The information contained in <br /> tllFs report',has rccerved,approgriate,,techa�csl review and approva4'f'hfs acknowledgement;is made in <br /> lreu;of all warranties, exthar expressed or mpLed: '; !i <br /> Project:' <br /> Pro t: FINAL REMEDIAL PLAN <br /> Art & Artists DRAFT 204 East Lodi Avenue <br />' Lodi, California <br /> Performed by: Geological Audit Services, Inc. <br />' 1803 West March Lane, Suite A <br /> Stockton, California 95207 }7� <br /> 1 <br /> J U L 1 3 7994 <br /> Report by: ENVIRONMENTAL HEALTH <br /> PERMITISERVICES <br /> 1 <br />' Bob Marty Date <br /> Project Manager <br /> Reviewed and Approved by: <br /> 1 J. Jay Roberts <br /> Senior Project Geologist <br /> Registered Geologist #3489 <br />