5.2 Soil and Groundwater Remediation <br /> As stated in section 2.7, a Draft Final Remedial Plan has been prepared by GeoAudit and <br /> is currently undergoing review by the PHS/EHD. A final copy of the FRP is scheduled to <br /> be completed in August 1994. Upon approval of the FRP, remediation start-up procedures, <br /> ' including sparging well installation, will be scheduled for September 1994. <br /> ' <br /> 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar localities. The findings <br /> were based upon analytical results provided by an independent laboratory. Evaluations of <br /> the geologic/hydrogeologic conditions at the site for the purpose of this investigation are <br /> made from a limited number of available data points (i.e. monitoring wells, water samples) <br /> and subsurface conditions may vary away from these data points. No other warranty, <br /> expressed or implied, is made as to the professional recommendations contained in this <br /> report. <br /> 1 <br /> a�p.d A.&k�1K <br /> M t Ar&%QW-9 IAT 10 <br />