Laserfiche WebLink
1 <br /> i <br /> TABLE OF CONTENTS <br /> Page <br /> g <br /> 1.0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 1 <br /> 2.1 Tank Removal 1 <br /> 2.2 Initial Investigation 1 <br /> 2.3 Initial Monitoring 4 <br /> 2.4 Installation of Monitoring Wells <br /> MW-4 and MW-5 4 <br /> 2.5 Installation of Monitoring Wells <br /> MW-6, MW-7 and MW-8 4 <br /> ' 2.6 Quarterly Groundwater Monitoring 5 <br /> 2.7 Final Remedial Plan Preparation 5 <br /> 3.0 PROCEDURES 5 <br /> 3.1 Monitoring Well Sampling 5 <br /> 3.2 Laboratory Analysis of Water Samples 6 <br /> 4.0 FINDINGS 6 <br /> 4.1 Groundwater Elevation and Gradient 6 <br /> 4.2 Laboratory Analysis of Groundwater Samples 7 <br />' 5.0 CONCLUSIONS & RECOMMENDATIONS 7 <br /> 5.1 Hydrocarbon Impacted Groundwater 7 <br /> 5.2 Soil and Groundwater Remediation 10 <br /> L _ <br /> 6.0 LIMITATIONS 10 <br /> 1 <br />