Laserfiche WebLink
1 <br /> 1 <br /> TABLE OF CONTENTS <br /> 1 Page <br /> 1.0 INTRODUCTION 1 <br /> 1 2.0 BACKGROUND 1 <br /> 2.1 Tank Removal 1 <br /> 2.2 Installation of Monitoring Wells <br />' MW-1 through MW-3 1 <br /> 2.3 Initial Monitoring 4 <br /> 1 2.4 Installation of Monitoring Wells <br /> MW-4 and MW-5 4 <br /> 2.5 Installation of Monitoring Wells <br /> 1 MW-6 through MW-8 4 <br /> 2.6 Quarterly Monitoring Program 5 <br /> 2.7 Depth to Groundwater - 5 <br />' 2.8 Groundwater Gradient 5 <br /> 2.9 Remediation Well RW-1 5 <br /> 3.0 PROCEDURES 6 <br />' 31 Monitoring Well Sampling 6 <br /> 3.2 Laboratory Analysis of Water Samples b <br /> 1 <br /> 4.0 FINDINGS 9 <br />' 4.1 Groundwater Elevation and Gradient 9 <br /> 4.2 Field and Laboratory Evidence <br /> of Contamination 9 <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS 9 <br />' 6.0 LIMITATIONS 12 <br /> 1 <br /> 1 <br /> r <br />