Laserfiche WebLink
' 24 November 1997 <br /> AGE-NC Project No 95-0112 <br /> Page 4 of 4 <br /> • The site should be considered for closure It is unlikely that additional remediation at the site <br /> would be cost-effective or result in a significant reduction of the remaining hydrocarbon <br /> mass <br />' • Upon closure certification, all monitoring, vapor and sparging wells associated with the site <br /> should be abandoned/destroyed in accordance with local regulations <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> t environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologlc/hydrogeologlc <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (e g , ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> t <br /> t <br /> 1 <br /> Advanced GcoEnvironmental,Inc <br /> z <br />