Laserfiche WebLink
1 <br /> Ile 27 February 1997 <br /> AGE-NC-95-0112 <br /> 1 Page 5 of 5 <br /> ' supplemental fuel, the extraction unit should be taken off-line If continued extraction is <br /> required, a blower/carbon canister system may be installed to the current extraction points <br /> This will reduce the operational costs and the level of disturbance to neighboring businesses <br /> ' The next quarterly ground water monitoring will be scheduled for April 1997 <br /> • Confirmatory borings are scheduled for installation at the end of February 1997 Borings will <br /> be placed near MW-1 and the former UST location Calculation of the original volume and <br /> remaining-volume of hydrocarbons in soil will be included with results of the confirmatory <br /> borings installation <br /> 5 0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> ' available data points (e g , monitoring wells, vapor samples) and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> 1 <br /> 1 <br /> 1 <br />