Laserfiche WebLink
SAN J OAQ U I N COMMUNITY DEVELOPMENT DEPARTMENT <br /> r <br /> COUNTY SITE APPROVAL <br /> Greatness grows here. 1 n O n 2 3 1 <br /> FILE NUMBER: 7 +' "? <br /> Owner Information Applicant Information <br /> Name Manii Sandhu Name: EPIC Wireless Group c/o Ashley Smith <br /> Mailing Address: Mailing Address: 605 Coolidge Drive, Suite 100 <br /> Folsom, CA 95630 <br /> Phone: 209-612-1127 Phone 916-936-5430 <br /> Email: sbrosfarms@hotmail.com Email ashley.smith@epicwireless.net <br /> Project Description <br /> (Attach additional sheets as necessary) <br /> Install Power/Telco/Fiber to Site Location <br /> Install AT&T Approved Pre-Manufactured 8'x8'Concrete Walk in Cabinet(CWIC)and associated equipment mounted on (P) <br /> Concrete Slab <br /> Install New GPS Unit <br /> Install 105' Monopole Tower <br /> Install (4)Antennas per sector for a total of(12) <br /> Install (6) RRU Per Sector A, (5) Per Sectors B & C, Total of(16) <br /> INstall (3) DC-6 Surge Suppressor at Antenna Location <br /> Install (3) Fiber Trunk, (8) DC Cables <br /> Install 6'Tall Chain Link Fence with 3 strand anti-climb barrier and 12'wide access gate <br /> Install 30kw DC Diesel Generator with 190 Gallon Tank on (P) Concrete Slab <br /> Install H-Frame with 200A Power Meter, Site Disconnect, Ciena, LIAM, and Telco Pull Can <br /> **No Grading Required <br /> Will the project include more than one(1)phase?Yes ❑ No CR <br /> Number of phases: 1 Phase Length of time: 2-3 Months of Construction <br /> Note.For questions regarding phasing, contact the Planning Division at 209-468-3121. <br /> Property Information <br /> Assessor Parcel Number Property Address Property Williamson Act Contract(Y or N <br /> Size <br /> 253-250-30 31850 South Chrisman Road, Tracy, CA 95304 42.37 acres Yes <br /> Page 1 of 6 <br /> Updated 04/29/2019 <br />