Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1800279 <br /> STOKES&LOMBARDI FARMS LLC/ DILLON& MURPHY <br /> Use Permit Application No. PA-1800279 was approved by the Planning Commission on February 21, <br /> 2019. The effective date of approval is March 3, 2019.This approval will expire on September 1, 2020 , <br /> which is 18 months from the effective date of approval,unless(1)all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in force, and (3) all <br /> necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Frank Girardi, [209]468-8469) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b. APPROVED USE: This approval is to establish a large winery in five (5) phases over ten (10) years <br /> as shown on the site plan dated November 2, 2018. (Use Type:Wineries and Wine Cellars-Winery, <br /> Large) <br /> • Phase 1 (with building permits to be issued within eighteen [18] months from the effective date <br /> of approval) the construction of a 10,000 square foot storage and bottling building. <br /> • Phase 2 (with building permits to be issued within seven [7] years from the effective date of <br /> approval) includes the construction of a 35,000 square foot multi-purpose building to include a <br /> tasting room, offices, and indoor event area. <br /> • Phase 3 (with building permits to be issued within eight [8] years from the effective date of <br /> approval) includes a 10,000 square foot expansion of the storage and bottling building. <br /> • Phase 4 (with building permits to be issued within nine [9] years from the effective date of <br /> approval) includes a 10,000 square foot expansion of the storage and bottling building. <br /> • Phase 5 (with building permits to be issued within ten [10] years from the effective date of <br /> approval) includes a 10,000 square foot expansion of the storage and bottling building. <br /> c. PRODUCTION CAPACITY: A large winery shall have a minimum production capacity of 100,000 <br /> gallons of wine per year. (Development Title Section 9-1075.3[a]) <br /> d. SETBACKS: The following requirements apply and shall be shown on the Site Plan: <br /> (1) New construction or the use of existing buildings, permanent parking areas and outdoor <br /> eating/entertaining areas shall be set back a minimum of 200 feet from Woodbridge Road <br /> (Development Title Section 9-1075.3[c][1]) <br /> PA-1800279 (UP) Conditions of Approval 1 <br />