Laserfiche WebLink
2,3 Note on plans that surface water will <br /> vertical plane located where fire- <br /> drain away from building and show <br /> resistive protection openings are <br /> drainage pattern. UBC Section <br /> first required due to location on <br /> 1804.7. property,or <br /> 2.4 Show lot and finish floor elevations. <br /> b. More than 12 inches into areas <br /> Indicate that the finished floor <br /> where openings are prohibited. <br /> elevation and building mechanical <br /> Note: Planning Division <br /> equipment shall be a minimum of 12 <br /> requirements may be more <br /> inches above the 100-year flood <br /> restrictive. <br /> elevation N.G.V.D. <br /> 2.8 Combustible projections located <br /> 2.5 Indicate that non-decay resistant <br /> where openings are not permitted or <br /> wood and HVAC duct work shall be <br /> where protection of openings is <br /> located above the floodplain <br /> required shall be of one-hour fire- <br /> resistive or heavy timber <br /> elevation. <br /> construction. UBC Section 705. <br /> 2,6 Indicate that areas in the floodplain <br /> a. A point one-third the distance to the <br /> shall have two or more openings in <br /> property line from an assumed <br /> the exterior wall on different sides, <br /> with the bottom edge within one vertical plane located where fire- <br /> foot of grade and a total net area not <br /> resistive protection openings are <br /> less than one square inch for each first required due to location on <br /> square foot of enclosed area. The property,or <br /> opening may be screened or <br /> louvered. b. More than 12 inches into areas <br /> where openings are prohibited. <br /> 2.7 Projections beyond the exterior wall <br /> Note:Planning Division <br /> shall not extend beyond. UBC requirements may be more <br /> Section 503.2.1: restrictive. <br /> a. A point one third the distance to the <br /> property line from an assumed <br /> 3 <br />