Laserfiche WebLink
5.2 Special moment-resisting steel frames. During the <br /> welding of special moment-resisting steel frames. <br /> In addition to Item 5.1 requirements above, <br /> nondestructive testing as required by Section 1703 <br /> of this code. <br /> 5.3 Welding of reinforcing steel. During the welding <br /> of reinforcing steel. <br /> EXCEPTION: The special inspector need not be <br /> continuously present during the welding of ASTM A 706 <br /> reinforcing steel not larger than No. 5 bars used for <br /> embedments, provided the materials, qualifications of <br /> welding procedures and welders are verified prior to the <br /> start of work; periodic inspections are made of work in <br /> progress; and a visual inspection of all welds is made <br /> prior to completion or prior to shipment of shop <br /> welding. <br /> 6. HIGH STRENGTH BOLTING. As required by Chapter 22, <br /> Division IV. Such inspections may be performed on a <br /> periodic basis in accordance with the requirements of <br /> Section 1701 . 6. <br /> ( ) 7. STRUCTURAL MASONRY. <br /> 7. 1 For masonry, other than fully grouted open-end <br /> hollow-unit masonry, during preparation and taking <br /> of any required prisms or test specimens, placing <br /> of all masonry units, placement of reinforcement, <br /> inspection of grout space, immediately prior to <br /> closing of cleanouts, and during all grouting <br /> operations. <br /> EXCEPTION: For hollow-unit masonry where the f'm <br /> is no more than 1, 500 psi (10.34 MPa) for concrete <br /> units or 2, 600 psi (17 .93 MPa) for clay units, <br /> special inspection may be performed as required for <br /> fully grouted open-end hollow-unit masonry <br /> specified in Item 7 .2 below. <br /> 7 .2 For fully grouted open-end hollow-unit masonry <br /> during preparation and taking of any required <br /> prisms or test specimens, at the start of laying <br /> units, after the placement of reinforcing steel, <br /> grout space prior to each grouting operation, and <br /> during all grouting operations. <br /> EXCEPTION: Special inspection as required in Items <br /> SIA.DOC <br /> 3 - <br />