Laserfiche WebLink
APPLICATION — SOLAR PHOTOVOLTAIC SYSTEM PERMIT <br /> �... .�o <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE,STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> • �gC�oRa�P INSPECTION REQUEST-24 HOUR RECORDER: (209)468-3165 <br /> PERMIT NO. CT70, 0 <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT.&O`I2DER`TO. <br /> APPLY FOR PERMITS REQUIRED TO BUILD A RESIDENCE. <br /> Scope of Work: C)GO �(� <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND <br /> Name: l, Name: aAA <br /> I <br /> Address: A U Address: <br /> City: State: City: �)� State: <br /> ZIP: Ph:( ) ZIP:" - Ph:( ) <br /> CONTRACTOR INFORMATION Ph:(x) <br /> Lic.No: U Company Name: <br /> Address: City: SV?A—ZIP: ` <br /> DESIGNER INFORMATION Ph:( > <br /> Lic.No: Company Name: <br /> Address: City: St: ZIP: <br /> CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVEL.OPW- T Check <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. -off <br /> 1. One completed Application for Solar Photovoltaic System Permit. <br /> 2. Two complete sets of construction drawings,wet signed by designer(11"x 17"size paper minimum). <br /> 3. Submit two(2)sets fully dimensioned site plans showing north arrows, location,size and use of all existing and <br /> proposed structures on the lot. Identify property lines and show lot dimensions and all easements. <br /> 4. Plans to show locations)of Solar Photovoltaic components. <br /> 5. Submit two (2)sets electrical drawings per 2001 California Electrical Code,Chapter 2,Article 200,and Article 690 <br /> Solar Photovoltaic Systems <br /> 6. Structural plans and details showing component attachment and/or support. <br /> 7. Electrical design calculations <br /> 8. Section 72 of the Revenue and Taxation Code now requires a copy of a Site Plan of the proposed work to be given <br /> to the County Assessor. Therefore,and additional site plan shall be submitted with all the standard plan submittal <br /> requirements. <br /> 9. Permit Deposit <br /> WHO MAY APPLY ? <br /> ONLY THE OWNER OF THE PROPERTY OR A LICENSED CONTRACTOR MAY TAKE OUT BUILDING PERMITS. <br /> Owner-Builder must submit the following with the application: Contractor must submit the following with the application: <br /> • A property tax statement or a recorded deed. • Current license numbers. <br /> • A completed and signed"Owner-Builder Verification"form. 0 A completed"Authorized to Sign"form if other than the <br /> • A completed"Authorization for Application"form if other than contractor applies(this is not necessary if this information is <br /> the owner applies. already on file with the Department). <br /> F:\BUILDING,% ANDOUTSWan0011145-SOLARPFIOTOVOLTIACSYSTEMAPPLICATION.Oce Page 1 of 2 <br /> (R-0 9-17-94) <br />