My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
212
>
2900 - Site Mitigation Program
>
PR0506145
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 11:02:46 AM
Creation date
11/12/2019 10:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506145
PE
2950
FACILITY_ID
FA0007226
FACILITY_NAME
BECKMAN BUILDING
STREET_NUMBER
212
Direction
W
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95241
APN
04303203
CURRENT_STATUS
01
SITE_LOCATION
212 W PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> The sampling probe will be washed with a phosphate free-detergent and rinsed with <br /> deionized water between use at each sampling location to prevent possible cross- <br /> communication of PCE or other HVOCs. The equipment rinse water and any soil <br /> generated from the soil gas sampling (investigation derived residuals) will be stored in <br /> 5-gallon buckets for later profiling and disposal. The 5-gallon buckets will be stored at a <br /> location onsite selected by the City of Lodi. <br /> After the completion of the sampling and analysis at each location, the small borehole will <br /> be filled with bentonite chips and hydrated with deionized water. For the sampling location <br /> outside the Beckman Building, the 1-inch diameter sampling probe will be able to penetrate <br /> the asphalt paving at the sampling locations. The small diameter hole in the asphalt paving <br /> will be patched with asphalt cold patch at each location. Inside the Beckman Building, a <br /> 1 1/2-inch diameter concrete core will be drilled through the building's concrete slab on <br /> grade to allow advancement of the sampling rods and collection of the soil gas sample. At <br /> the completion of the sampling and analysis, the concrete cores will be filled and leveled <br /> with a quick set , non-ferrous, non-shrink concrete grout. <br /> Kennedy/Jenks will review the analytical results from each sampling location as it becomes <br /> available during the course of the investigation. If the evaluation of the data suggests a <br /> trend in PCE concentrations that warrants collection of soil gas sample(s) from a different <br /> location, Kennedy/Jenks may amend the sampling plan with approval of the City of Lodi to <br /> collect data from these new locations. <br /> 2.3 Report Preparation <br /> After completing all field work, Kennedy/Jenks will summarize the collected data into a brief <br /> letter report. The letter report will contain the following: <br /> • A map showing the sampling locations, both inside and outside the Beckman Building. <br /> • Description of the methods used to collect the soil gas samples and analyze the soil <br /> gas samples. <br /> • A map showing PCE isoconcentration lines with depth as determined by the analytical <br /> data. <br /> • A brief discussion of the results of this investigation addressing the presence of PCE in <br /> the soils in the vicinity of the Beckman Building. <br /> • Conclusions on the data analysis and recommendations for additional work, if <br /> warranted. <br /> • Copies of the laboratory analytical reports and chain of custody documentation. <br /> 3!8!96 8:38 AM 3 952704.01 <br /> g:\jobs\952704.01\lodi.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.