My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
712
>
2900 - Site Mitigation Program
>
PR0528086
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 1:44:20 PM
Creation date
11/12/2019 1:25:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0528086
PE
2959
FACILITY_ID
FA0019017
FACILITY_NAME
FORMER LODI MGP
STREET_NUMBER
712
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04532006
CURRENT_STATUS
01
SITE_LOCATION
712 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> February 4,2009 <br /> Mr. Robert Aragon <br /> Page 4 of 4 <br /> Re:Well Abandonment Work Plan <br /> TASK 6—REPORTING <br /> Documentation of the well abandonment will be submitted in a letter report. Documentation will include a <br /> brief written summary, waste profile results, permits, and other pertinent information. <br /> State of California Well Completion Reports (DWR Form 188) will be submitted to the California <br /> Department of Water Resources. <br /> SCHEDULE <br /> Stantec proposes to abandon the two water wells within one month of Work Plan approval by the DTSC. <br /> We anticipate that all well abandonment activities will require approximately three days to complete. <br /> If you have any questions regarding the material presented in this Work Plan, please contact Melitta <br /> Rorty, PG&E Project Manager, at(925)415-6328 or the Eva Hey at(925)299-9300. <br /> Sincerely, <br /> Stantec Consulting Corporation <br /> Khamly Chuop Thomas W. Cr sby, CEG, CHG. <br /> Project Scientist Principal Engi eering Geologist <br /> 'Cl ED GAO <br /> Attachments: Figures 1—Site Location Map THOMAS W. CN <br /> CPOSBY a <br /> Figure 2—Site Plan NO HG 257 <br /> �:;;:RTIFIED <br /> cc: Melitta Rorty, PG&E tP HYQROGEOLOGIST <br /> OF CALF Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.