Laserfiche WebLink
Responsiveness Summary <br /> Former Lodi Manufactured Gas.Plant Site <br /> June 22,2012 <br /> Page 2 <br /> The RAW and associated documents are also available for review at: <br /> Fresno County Free Library- Reference Desk <br /> 2420 Mariposa Street <br /> Fresno, CA 93721 <br /> (559) 600-7323 <br /> Or electronically at: http•//www.envirostor.dtsc.ca.gov/public. <br /> II. Comment and Response <br /> Comment: <br /> "Considering the economics of the City of Lodi,the State of California,the United States of <br /> America, and all European nations,the soonest this ground would be needed for any purpose <br /> that would at al disturb it would be a minimum of fifty years. Leave it alone!." Received May <br /> 30, 2012 from Mr. James N. Sayles, 411 S. School Street, Apt. 1, Lodi, CA 95240. <br /> DTSC Response: <br /> Pacific Gas and Electric Company (PG&E) is voluntarily cleaning up this project and bearing the <br /> sole cost of project investigation and cleanup. The remediation of this site is part of a <br /> company-wide program to address soil and groundwater impacts at all manufactured gas plant <br /> properties that the company historically owned and/or operated. <br /> DTSC's mission is to provide the highest level of safety and to protect public health and the <br /> environment from toxic harm. Cleanup of this site is in keeping with DTSC's mission. <br />