My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
712
>
2900 - Site Mitigation Program
>
PR0528086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 1:48:13 PM
Creation date
11/12/2019 1:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528086
PE
2959
FACILITY_ID
FA0019017
FACILITY_NAME
FORMER LODI MGP
STREET_NUMBER
712
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04532006
CURRENT_STATUS
01
SITE_LOCATION
712 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Sampling Workplan <br /> Former Manufactured Gas Plant—Lodi,California <br /> TABLE OF CONTENTS <br /> Page <br /> LISTOF FIGURES........................................................................................................................................2 <br /> LISTOF APPENDICES.................................................................................................................................2 <br /> LISTOF ACRONYMS AND ABBREVIATIONS............................................................................................3 <br /> ACKNOWLEDGMENT AND SIGNATURE PAGE........................................................................................4 <br /> 1.0 INTRODUCTION..............................................................................................................................5 <br /> 2.0 BACKGROUND...............................................................................................................................6 <br /> 2.1 SITE LOCATION AND DESCRIPTION...................................................................................................6 <br /> 2.2 SITE HISTORY................................................................................................................................6 <br /> 2.3 SITE GEOLOGY...............................................................................................................................7 <br /> 2.4 SITE HYDROGEOLOGY.....................................................................................................................8 <br /> 3.0 PROPOSED SCOPE OF INVESTIGATION ACTIVITIES................................................................9 <br /> 4.0 FIELD PROCEDURES...................................................................................................................10 <br /> 4.1 PERSONNEL AND PROCEDURES.....................................................................................................10 <br /> 4.2 PERMITTING AND ACCESS.............................................................................................................10 <br /> 4.3 HEALTH AND SAFETY PLAN............................................................................................................10 <br /> 4.4 UTILITY CLEARANCE.....................................................................................................................10 <br /> 4.5 DRILLING AND SOIL SAMPLING PROCEDURES..................................................................................11 <br /> 4.6 DECONTAMINATION AND WASTE MANAGEMENT PROCEDURES..........................................................12 <br /> 5.0 QUALITY ASSURANCEIQUALITY CONTROL PLAN..................................................................13 <br /> 6.0 REPORTING AND SCHEDULE.....................................................................................................14 <br /> 6.1 REPORTING..................................................................................................................................14 <br /> 6.2 SCHEDULE...................................................................................................................................14 <br /> 7.0 References....................................................................................................................................15 <br /> TERRA PACIFIC GROUP Page 1 October 19, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.