My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
712
>
2900 - Site Mitigation Program
>
PR0528086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 1:48:13 PM
Creation date
11/12/2019 1:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528086
PE
2959
FACILITY_ID
FA0019017
FACILITY_NAME
FORMER LODI MGP
STREET_NUMBER
712
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04532006
CURRENT_STATUS
01
SITE_LOCATION
712 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Quality Assurance/Quality Control Plan <br /> A.5 CORRECTIVE ACTION <br /> During the course of the project, it will be the responsibility of the Responsible Manager to ensure <br /> that all of the specified sampling procedures are followed and that data meet prescribed acceptance <br /> criteria. The field and analytical procedures will be reviewed if QA/QC problems or deficiencies <br /> requiring corrective action occur. If a problem is discovered, prompt and prescribed action will be <br /> taken to correct the problem. Corrective action may be initiated based upon QC data or audit <br /> results. <br /> A.6 QUALITY ASSURANCE REPORTS <br /> The Responsible Manager and QA Director will rely on written reports and memoranda <br /> documenting data assessment activities, audits, nonconformance, and corrective actions to verify <br /> that QA requirements are being met. QA/QC activities will be documented. All information <br /> received from an outside source or developed during the project will be stored in project files. The <br /> Responsible Manager will identify which field documents will be designated as QA records for the <br /> project file. The Responsible Manager will also ensure that QA records are properly stored and <br /> retrievable upon completion of the project. <br /> TERRA PACIFIC GROUP Page A-5 of A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.