Laserfiche WebLink
Pre-Design Investigation Workplan <br /> Former Manufactured Gas Plant—Lodi, California <br /> 6.0 REPORTING AND SCHEDULE <br /> 6.1 REPORTING <br /> Following completion of the sampling and testing activities proposed, the data will be compiled and <br /> incorporated into the pre-design and planning activities of the project. The data will additionally be <br /> summarized and presented in a Technical Memorandum. <br /> 6.2 SCHEDULE <br /> Pre-field activities will be initiated within four weeks of receiving Workplan approval. Upon <br /> completion of pre-field activities, the proposed field work will be completed within approximately 6 <br /> weeks. <br /> TERRA PACIFIC GROUP Page 20 April 4, 2012 <br />