My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control.BoarO,, <br /> Central Valley Region <br /> w> <br /> Winston H.Hickox Robert Schneider,Chair 03 AUG C 7 F;l 1: 35 Gray Davis <br /> Secretary for Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> August 20, 2003 <br /> Former Busy Bee Cleaners <br /> c/o Mr. Joseph Salazar, Jr., Attorney at Law <br /> Mayall,Hurley, Knutsen, Smith and Green <br /> 2453 Grand Canal Blvd., Second Floor <br /> Stockton, CA 95207-8253 <br /> REMED]AL INVESTIGATIONAND FEASIBILITY STUDY WORKPLAN; FORMER BUSYBEE <br /> CLEANERS,SAN JOA QUIN COUNTY <br /> We have reviewed your submittal entitled"Remedial Investigation and Feasibility Study Workplan" <br /> (RDFS Workplan) dated June 25, 2003 and prepared by E2C Remediation. Our comments on the <br /> document are provided below. <br /> Back rg ound <br /> Busy Bee has completed its Phase 1 site characterization work and installed several groundwater <br /> monitoring wells as outlined in Busy Bee's Phase 2 Site Characterization Work Plan. Busy Bee now <br /> proposes, in the RDFS Workplan,to perform further work at the site as follows: <br /> • Perform a soil vapor extraction pilot study along the southern portion of the sewer line located in <br /> the alleyway east of the former Busy Bee facility. The SVE pilot test would include the <br /> installation of 3 dual completion SVE wells, 2 deep zone SVE wells, approximately 600 feet of <br /> buried pipeline and a vapor phase carbon treatment system; <br /> • Perform an ozone sparging pilot test along the southern portion of the sewer line located in the <br /> alleyway east of the former Busy Bee facility. The ozone sparging pilot test would include the <br /> installation of 6 ozone sparging points (2 of which would also be dual completions to allow deep <br /> zone SVE testing), one ozone monitoring well, approximately 300 feet of buried pipeline and <br /> ozone generation equipment. <br /> • Perform a pilot study of groundwater extraction for containment at the downgradient edge of the <br /> shallow PCE plume. The groundwater extraction pilot test would include the installation of a <br /> shallow zone groundwater extraction well, approximately 1000 feet of buried pipeline, and a <br /> liquid phase carbon treatment system. <br /> • In support of the proposed pilot testing, and to further characterize the extent of the contaminant <br /> plume downgradient from the site, Busy Bee also proposes to install 3 shallow groundwater <br /> monitoring wells and one deep groundwater monitoring well. <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.