My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 3:31:37 PM
Creation date
11/12/2019 3:25:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Number 1804BK54 April 11,2013 <br /> 2.2.1 Well Abandonment Methods and Procedures <br /> Environmental Control Associates, Inc. (ECA) of Aptos, California (C-57 License <br /> #695970) will perform the well abandonment activities. The abandonment activities <br /> will be overseen by E2C field personnel, under the direction of an E2C California <br /> Professional Geologist or Professional Engineer. Abandonment will be conducted as <br /> follows: <br /> ■ All wells will be pressure-grouted. <br /> Pressure Grout Method <br /> The pressure grout method consists of the following procedures: <br /> ■ Each well will be filled with neat-cement grout by placing a tremie pipe at the <br /> bottom of the well and pumping cement grout down the well; <br /> ■ Once filled with grout, each well will be pressurized to 50 pounds per square <br /> inch (psi) with air and the pressure will be maintained for 15 minutes; <br /> ■ The protective well head box of each well will then be manually removed and <br /> the upper 3 feet of the borehole will be drilled out using 8-inch or 10-inch <br /> augers; <br /> ■ Well DW-41313 is set inside a steel conductor casing. That casing will be cut off <br /> 3 feet bgs using a torch, or casing cutter tool; <br /> ■ The drill cuttings and wellheads will be removed and stockpiled for disposal at <br /> the local landfill; and <br /> ■ The upper 3 feet of the borehole will be backfilled in accordance with City of <br /> Lodi permit specifications. <br /> 2.3 Task 3 -Piping Abandonment <br /> Piping connecting vapor extraction and air sparge wells to the former remediation <br /> compounds will be left in place and the ends will be capped with a concrete plug. The <br /> manifold piping at each equipment compound will be cut off at ground surface and <br /> each pipe will be capped with a concrete cap flush with the ground surface. <br /> 2.4 Task 4 -Reporting <br /> Following the completion of the field activities a Site Decommissioning Report of <br /> Findings will be prepared by E2C. The report will document all well destruction and <br /> site decommissioning activities. The Report will be prepared by, reviewed by, and <br /> certified by a State of California Professional Geologist or Engineer. <br /> E2C Remediation 3 <br />