Laserfiche WebLink
a <br /> COUNTY OF SAN JOAQUIN <br /> ?;• ;y THOMAS R.FLINN <br /> -� DEPARTMENT OF PUBLIC WORKS DEPUTVDIRECTOR <br /> IX <br /> N P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON.CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> i F O RN FAX:209/468 2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> October 21, 1998 OC T 2 3 1998 <br /> MEMORANDUM C0111munity Develcnment Deo;. <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler Martin <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: MS-98-34 MINOR SUBDIVISION APPLICATION TO CREATE A 0.3 ACRE <br /> COMMERCIAL LOT AND A REMAINDER PARCEL TO CONTAIN 24.5 ACRES, <br /> LOCATED ON THE SOUTHWEST CORNER OF STATE HIGHWAY ROUTE 12 <br /> AND FLAG CITY BOULEVARD. (DISTRICT 4). <br /> APPLICANT: Yousif H. and Iman Y. Halloum APN: 055-160-53 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. In addition, the existing San Joaquin County and City of Stockton Flood Insurance Studies, which <br /> delineate flood risks, floodplains, and floodway areas, are currently being reevaluated. The reevaluation <br /> is being conducted by the Federal Emergency Management Agency, Region IX, Building 105, Presidio <br /> of San Francisco, California 94129-1250,telephone(415)923-7186. The reevaluation may delineate <br /> additional flood risks. The official flood maps are available for review at the Department of Public Works, <br /> 1810 East Hazelton Avenue, Stockton. These flood maps will be updated when the reevaluation process is <br /> completed. <br /> Flag City Boulevard has an existing right-of-way width of 60 feet and a planned right-of-way width of <br /> 60 feet. Banner Street has an existing right-of-way width of 60 feet and a planned right-of-way width of <br /> 60 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcel is developed. The fee is due and payable <br /> at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br />