My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012712
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:43:28 AM
Creation date
11/14/2019 4:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012712
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--T <br /> �i ONERIME ig <br /> I'MR-E-i09M <br /> t <br /> EQUIPMENT INSTALLATION <br /> The c <br /> ataly <br /> tic ir:cinerator, pumping unit and accumulator/ <br /> concrete pad, and connected to the <br /> water knockout device will be delivered to the site, <br /> installed oma. an existing lace. <br /> extractiokl system already in p <br /> opEPWION AND MAINTENANCE <br /> Catalytic Incinerator Start-up <br /> operation will be initiated. <br /> The vacuum extraction systemwill be performed to ensure <br /> The required source testing <br /> Hydrocarbon <br /> compliance with per pltted emissi�Qbeoandtwell+will be <br /> concentration as vapor at each p au a the progress of <br /> recorded to establish a baseline tog g <br /> the remediation. <br /> Operation hours per day, <br /> The catalytic incinerator wi lopeilleb24monitored and <br /> seven days per week. The systemMonitoring itorin will include <br /> adjusted on a monthly basis. <br /> analyzing <br /> the influent hydrocarbon concentrationsttOnrp . <br /> document the tpro renshe e, ;tfstreamthe etodthelatmosphereon and Yto ensure <br /> xhaucsampling of enation is within permitted emission <br /> that system op robes and wells will <br /> conditions. The individua�asisraisaato document the <br /> idual <br /> be monitored on a monthly at an <br /> progress of the ExtractiO <br /> p of that p <br /> probe or well will be disc <br /> vapor concentrations at each groundwater <br /> concentration has been reduced in the vicinity <br /> or well. well not connected to the system will be. <br /> monitoring ' system monitoring. <br /> monitored at the monthly Y <br /> ent and Reports <br /> Project Manag <br /> em <br /> Project Management will coordinate thtosensurestem mco compliance <br /> review the results of the monitoring to the regulatory <br /> with regulations and submit the data eguports for <br /> ed <br /> re <br /> agency <br /> as require <br /> and prepare brief monthly <br /> Exxon that include the results of the monitoring- <br />
The URL can be used to link to this page
Your browser does not support the video tag.