My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012713
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:14:52 AM
Creation date
11/14/2019 4:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012713
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
774
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE <br /> CONCERNING SOIL SAMPLING METHODOLOGY <br /> SOP 14 <br /> Soil samples should be collected and preserved in <br /> accordance with Groundwater Technology Laboratory's <br /> Standard Operating Procedure (GTL SOP 15) concerning <br /> Soil Sample Collection and Handling when Sampling for <br /> Volatile Organics. A hollow stem soil auger should be <br /> used to drill to the desired sampling depth. A standard <br /> 2 inch diameter split spoon sampler 18 inches in length <br /> shall be used to collect the samples. The samples are <br /> contained in 2 inch diameter by 6 inch long thin walled <br /> brass tube liners fitted into the split spoon sampler <br /> (three per sampler) . <br /> The split spoon sampler should be driven the full depth <br /> F, of the spoon into the sail using a 140 pound hammer. <br /> The spoon shall then be extracted from the borehole and <br /> the brass tube liners containing the soil sample removed <br /> from the sampler. The ends of the liner tubes should be <br /> immediately covered with aluminum foil, sealed with a <br /> teflon or. plastic cap, and then taped with duct tape. <br /> After being properly identified with sample data entered <br /> on a standard chain of custody form the samples shall be <br /> placed on dry ice (maintained belovy 4°C) and transported <br /> to the laboratory within 24 hours. <br /> One of the three soil samples retrieved at each sample <br /> depth shall be analyzed in the 'field using a photoioni- <br /> zation detector and/or explosimeter. The purpose of the <br /> field analysis is to provide a means- to choose samples <br /> to be laboratory analyzed for hydrocarbon concentrations ; <br /> and to enable comparisons between the field and..:labor- <br /> atory analyses.. The soil sample sahall: he sealed in <br /> _ aplastic bag and placed in the sun ta .accelerate the <br /> vaporization of .volatile hydrocarbons from the sail. One <br /> of the -two field vapor instruments shall be used to <br /> quantify the .amount of hydrocarbon released to: the air. <br /> from .the soils. The data shall be recorded .on the drill . <br /> logs at the depth corresponding to the sample point. <br />
The URL can be used to link to this page
Your browser does not support the video tag.