TRACY WWTo-TASK 14 TOS MOWTORIRO WELL INSTALLATION WORK GLEN <br /> • The surface seal will be concrete emplaced from the top of the cement grout to <br /> approximately 6 inches above grade. The surface seal will be graded from the protective <br /> casing to grade level for drainage. The well identifier will be marked in the concrete pad <br /> (and on the well cap). <br /> • A cylindrical steel,lockable protective casing will be emplaced into the surface seal. <br /> Two or three guard posts will be installed,if determined by the City to be necessary for <br /> protection from truck traffic. <br /> Specific details on final monitoring well design will be provided in the Monitoring Well <br /> Installation Report to be completed and submitted to the CVRWQCB after field activities are <br /> completed. <br /> Well Development Approach <br /> Installed monitoring wells will not be developed until at least 48 hours after installation to <br /> allow for grout curing.Wells will be developed using surge blocks along the entire well <br /> screen length and bailers or pumps.Development will continue until the measurements of <br /> temperature,conductivity,and pH are stable and the turbidity remains within <br /> 10 nephelometric turbidity unit(NTU)range for at least 30 minutes and no suspended <br /> turbidity or sediments are visible in the purge water.Purge water will be contained and <br /> then processed at the WWTP. <br /> Record of well development activity and monitored parameters will be maintained on the <br /> field activities form. <br /> Well Surveying <br /> A survey will be conducted after the completion of the field investigation using <br /> CH2M HILL licensed surveyors or a subcontracted licensed surveyor. The survey will be <br /> conducted to provide horizontal and vertical positions for sample locations.'The horizontal <br /> datum will be the California Coordinate System,North American Datum of 1983(NAD83), <br /> Zone 2;and the vertical datum used will be the North American Vertical Datum of 1988. <br /> The three new monitoring wells installed for this project will be surveyed,as well as the <br /> existing holding pond monitoring wells. This will enable comparison of water level data <br /> among the City's monitoring well network and groundwater investigations at other sites. <br /> For each well,the ground surface elevation at the northern edge of the pad will be surveyed. <br /> The measuring point on the well riser(also on the north side of the well)will be marked and <br /> surveyed. <br /> Schedule <br /> The new monitoring wells are planned to be installed either the week of November 19 <br /> or 26,2007. This enables the wells to be developed and then sampled in early December <br /> 2007 with the holding pond wells. <br /> Octobw 31.2007 7 <br />