My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081205 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPELLINO
>
6362
>
2600 - Land Use Program
>
SR0081205 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 10:32:11 AM
Creation date
11/18/2019 10:27:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081205
PE
2602
STREET_NUMBER
6362
STREET_NAME
CAPELLINO
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
08717043
ENTERED_DATE
9/26/2019 12:00:00 AM
SITE_LOCATION
6362 CAPELLINO CT
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the On-Site Wastewater Treatment Systems Standards may be greater than those <br /> discussed here. <br /> Denitrification Reductions <br /> Denitrification is a process that occurs in the septic system drain field whereby certain <br /> bacteria oxidize the nitrate (NO3) in the wastewater and release nitrogen gas (N2) to the <br /> atmosphere. Due to the biologic processes in the shallow soils, nitrogen in the drain <br /> field will may undergo a reduction between 10 percent to 35 percent. Soils with higher <br /> clay content, moist soil conditions, high pH, and organic material denitrify by about 35 <br /> percent, and soils with high sand content tend to denitrify at a lower rate of about 10 <br /> percent. <br /> A denitrification factor of 35 percent was selected for the Site because of the clayey soil <br /> present at the percolation test location. <br /> Nitrate Loading Estimate <br /> A nitrate loading scenario was employed to determine the impact from the proposed <br /> project to ground water. The scenario utilizes the variables discussed previously, which <br /> represent the estimated conditions and uses associated with this project. The following <br /> table presents a summary of the assumptions for the nitrate loading calculation for the <br /> Site, as presented in Plate 16. <br /> Table 3. Assumptions for Nitrate Loading Calculation <br /> Variable Value Units Description <br /> Q 840 gpd Effluent flow rate <br /> Nw 35 mg/L-N Effluent stream concentration <br /> A 1.5 acres Site area <br /> Nb 0.3 mg/L-N Concentration of rain <br /> d 0.35 constant Denitrification factor <br /> R 8.16 inches per year Recharge rate of rainfall <br /> W 7.5 inches per year Uniform waste water loading (calculated) <br /> The details of the nitrate loading calculation are included in Plate 16. The results of the <br /> calculation are presented in the following table. <br /> LOGE 1942 Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.