APPLICATION - QUARRY EXCAVATION
<br /> !� .'. SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
<br /> cq.:^:;..•;P FILE NUMBER: QX-
<br /> RECLAMATION PLAN
<br /> CHECKLIST-CONTINUED
<br /> [� 3. Describe how slopes will be stabilized to prevent failures/landslides, earth flows,falling rock, and erosion.
<br /> [ ] 4. Specify slope design calculations including the factor of safety.
<br /> [ ] D. Impoundments: Describe how impoundments will be reclaimed (e.g., regraded,dewatered, capped, revegetated,
<br /> removed,etc.).
<br /> [X] E_ Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be
<br /> controlled during excavation and after final reclamation (e.g.,revegetation, rip rap,sedimentation basins, berms,ditches,
<br /> water bars,silt screens regrading, etc.).
<br /> [X] F. Disposition of Old Equipment: Discuss the disposition of equipment, buildings,structures,etc.
<br /> G. Revegetation:
<br /> [X] 1. Explain topsoil(or soil substitute)redistribution methods,including volumes of materials to be redistributed,
<br /> equipment and methods for transport,methods for preventing over compaction,and schedule for replacement. The
<br /> explanation may include:
<br /> [ l a. the average thickness of replaced topsoil on the mine site;
<br /> ( l b. tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support
<br /> plant growth'
<br /> ( ] c. methods to be used to protect redistributed topsoil (or soil substitute)from wind and water erosion before and
<br /> after seeding and planting.
<br /> [ ] 2. Explain the types and amounts of fertilizers, mulch,soil stabilizers, lime,or other materials that will be used in
<br /> revegetation and indicate when they will be applied.
<br /> ( ] 3. Provide a planting (landscape)plan. The plan may include:
<br /> ( ] a. how the site will be prepared for planting (e.g., ripping, disking, and incorporation of soil additives),
<br /> [ ] b. a list of the species(include scientific names)to be planted,
<br /> [ ] c. the type of plant material to be used (e.g.,seeds, cuttings, container, plugs),
<br /> [ ] d. the density or rate of planting (e.g., pounds/acre, cuttings on 5 foot centers,etc.),
<br /> [ ] e. a revegetation map indicating species and location.
<br /> [ J 4. Describe what planting method(s)will be used(e.g.,hydroseeding, hand planting,seed drill, etc.).
<br /> [ ] 5. Discuss when (during which month(s))planting will take place and the relationship between timing and the success
<br /> of the revegetation plan.
<br /> [ ] 6. Describe how the plants will be protected from predation and disturbance(e.g.,fencing,signs,etc.).
<br /> 7. Irrigation: If irrigation is proposed,then discuss:
<br /> [ ] a. the kind of irrigation system that will be used to water the plants;
<br /> [ l b. the water source and the water quality of that source;
<br /> 'ADEVSVOPlanning Application Forms\ Page 12 of 19
<br /> :uarry Excavation.doc.(Revised 02-03-10)
<br />
|