My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012613
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
PA-1900025
>
SU0012613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 11:05:27 AM
Creation date
11/19/2019 8:16:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012613
PE
2631
FACILITY_NAME
PA-1900025
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
19327020
ENTERED_DATE
10/18/2019 12:00:00 AM
SITE_LOCATION
10500 S HARLAN RD
RECEIVED_DATE
10/18/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VICINITY <br /> 10W HARLAN RD, <br /> N.T.S. <br /> 56DD"E <br /> 1298.61 a - — — I D V, LANAP P L I CATION NO . <br /> 1298. <br /> ti <br /> 20' w ri i €�iVrl <br /> # I , 1 0,n- - Rec&WBy On�J�, ,ASSESSOR PARCEL NUMBERS <br /> / <br /> LU TANK z <br /> Z0 q 193-27-019 <br /> / o _ <br /> LO p Y <br /> CD PROJECT <br /> EXIST. SEPTIC TANK AND � LOCATION OWN E R APPLICANT ENGINEER <br /> LEACH FIELD 140' x 96' = GRANITE CONSTRUCTION CO. ROBERTSON'S READY MIX MICHAEL OROZCO, PE <br /> 4001 BRADSHAW RD. 200 SOUTH MAIN STREET P.O. BOX 3600 <br /> 1 I — — o S Ro SACRAMENTO, CA 93827 CORONA, CA 92882 CORONA, CA 92878-3600 <br /> / EXIST.WELL z E "�` (916) 855-4400 <br /> --- Q (800) 834-7557 (951 ) 493-6500 <br /> PUMP HOUSE <br /> Qz <br /> SCOPE OF WORK <br /> • INSTALL SINGLE ALLEY PORTABLE CONCRETE BATCH PLANT ON A <br /> ROTH RD. PORTION OF THE SITE, WITH RELATED SAND, GRAVEL, PORTLAND <br /> �f CEMENT AND CONCRETE ADMIXTURE STORAGE. <br /> • INSTALL (1 ) PORTABLE CONCRETE BATCH PLANT, (2) CEMENT SILOS, <br /> ONE(1 ) FLY ASH GUPPY, VARIOUS STORAGE, BINS, AND BELT <br /> SITE NOTES CONVEYORS. <br /> / O SINGLE ALLEY "DRY MIX" CONCRETE BATCH PL-"J. <br /> • A SINGLE STORY COMMERCIAL COACH USED FOR A BATCH OFFICE <br /> DRIVER'S ROOM AND ELECTRICAL ROOM. <br /> EXISTING 24 FT. WIDE ASPHALT DRIVEWAY TO BE WIDEN TO 30 . ABOVE GROUND DIESEL FUEL TANK. <br /> ( FT. <br /> EXISTING OFFICE • INSTALL SEPTIC TANK. <br /> i READY MIX TRUCK / DRIVER PARKING 10 ' 0" X 35' -0" . PERIODIC RECYCLING OF CONCRETE INTO BASE MATERIAL. <br /> STANDARD 9' -0" X 20' -0" AUTOMOBILE PARKING SPACE, <br /> VAN i <br /> i I LOADINGEZONBLE PARKING SPACE 14' -0" X 19 0" WITH 5' LAND U S E <br /> E.w <br /> i r _ O ABOVE GROUND STORAGE TANK 1 ,000-GALLON (DIESEL) WITH ZONING CURRENT - I-G <br /> oM - VACANTLAND USE CURRENT <br /> / <br /> -,I- N CONCRETE CURB. LAND USE PROPOSED - CONCRETE BATCH PLANT <br /> Z SINGLE STORY COMMERCIAL COACH 12' x 36' WITH BATCH OFFICE, TOTAL ACRES - 8,27 AC. <br /> I O DRIVER'S ROOM, ELECTRICAL ROOM AND OFFICE. (NO WATER AND <br /> SEWER AVAILABL E <br /> E BEFORE PROJECT PROPOSED <br /> / O ON-SITE DETENTION/INFILTRATION BASIN. BATCH PLANT/STRUCTURES 0 SF [ 0.0%] 183000 SF <br /> PARKING 0 SF [ 0.0%] 33000 SF <br /> CO Arr55 RD" APN: 193-27-01 PROPOSED SEPTIC TANK WITH (3) 4" DIA. PERF. PIPE LEACH PAVED 0 SF ( 0.0%] 15200 SF <br /> z + LINES SLOPED @ 2% + (3) EXPANSIONS LINES PER SJC OWTS LANDSCAPING 0 SF [ 0.0%] 0 SF <br /> --- ENTRANCE/ I STANDARDS RECYCLE CONCRETE 0 SF [ 0.0%] 12,000 SF <br /> EXIT � <br /> (E)D/W B STORM WATER BASIN 0 SF [ 0.0%] 11750 SF <br /> --I 30 I--- OVERFLOW WEIR LANDSCAPED AREA WITH MULCH AND SPRINKLERS. EASEMENT 0 SF [ 0.0%] 0 SF <br /> TO BE WIDENED�j---- -- <br /> __ _ TOTAL (3.3 ACRES) <br /> FH� <br /> . I � RESTROOMS CONNECTED <br /> �--, � _ _ TO SEPTIC TANK.F �--� � <br /> RIPRAP H <br /> CONCRETE � .. .�. .. _ @INLET _ � — ,—,,,— —,;, ,:, <br /> PARKING <br /> PAVING RUMBLE GRATE <br /> - AT EXIT . f3 I LEGEND [FROM TABLE 9-1015.3(B)] <br /> I /� EXIST. DRAINAGE PARKING PROPOSED PROPOSED ADDITIONAL <br /> SHEET FLOW <br /> PROPOSED AREA N0. TOTAL <br /> �x (�` TO BASIN STRUCTURE USE (SO.FT.) EMPLOYEE (0.5 AUTO HANDICAP TRUCK/EMPLOY PARKING <br /> I ' \ __ SPACE/ PARKING PARKING PARKING <br /> W \\ PROPERTY LINE <br /> x EMPLOYEE) <br /> (E)400 AMP / LANDSCAPING BATCH OFFICE OFFICE 432 15 8 2 1 12 15 <br /> / � \ SERVICE QQ� <br /> x vJ I -- STREET LIGHT <br /> A I <br /> EXIST. CONTOUR AUTOMOBILE = 91 x 20'L <br /> TEMP.WATER LINE � <br /> OVERHEAD VAN ACCESSIBLE = 17'W x 19'L <br /> 1 CONVEYORS • 948— FINISHED CONTOUR TRUCK PARKING = 10'W x 35'L <br /> :• I co o �� TRAFFIC CIRCULATIO SERVICE UTILITIES <br /> j �.9 O�� • ���oo e �r �� 193-27-020 J�7� �� x x x CHAIN LINK FENCE <br /> _ ��P p I T WATER: ELECTRIC: TELEPHONE: <br /> j OFF o4`�" o CITY OF STOCKTON PACIFIC GAS & ELECTRIC AT&T <br /> o ' z <br /> 209-937-8436 800-743-5000 <br /> t Gj PUMP WASH-WATER TO PLANT <br /> y <br /> til oo� <br /> SUMP TO BE RE-USED SEWER: <br /> it �� �FFo/9 ! WASHOUT BASINS I ON-SITE DISPOSAL <br /> (CONCRETE LINED) I Concrete Batch Plant - Elevation View <br /> AGG. SCALE: 1 "=10' <br /> • STORAGE x <br /> - K---------- <br /> DRIVE-OVER � <br /> GRIZZLY -is -====s-=s== <br /> __---- - <br /> CONCRETE ! — s x SBs°44'oo"E JWT SHT DWG SHEET INDEX <br /> PAVING <br /> 668.62 _ _ _ _ — — 1 E01 TITLE / SITE PLAN <br /> �! W 10.33'TYP.PIPE ILEACH FIELD (3)-4" PERF. <br /> SPACING plpE + (3)-4 EXPANSION X X9'-4' [8,93 2 101 FOUNDATION LAYOUTJDETAIL <br /> .5~'.:3: r' f <br /> Co <br /> L0 <br /> / <br /> - -- - - -_ -N�44'00'W <br /> / — - - 1499.74CO3 <br /> A 'RS RD, - <br /> •, � .f <br /> rrz <br /> 860.18 1.0, „� / - ~ �\ C? <br /> N89044'00"W f i N <br /> f � N <br /> i � <br /> i APN: 193-27-016 � <br /> },r <br /> 07 <br /> l A PART) <br /> N I <br /> r• 50 ' 7 — <br /> 0 25 50 75 100 1366 <br /> 11111 ip!%iii NOTE: R01BERMM SITE PLAN PLANT PROJECT 57 <br /> SCALE I°=50' <br /> 1 . BATCH PLANT TO RUN OFF GRID POWER. AN EXISTING 400 200 South Main Street, Suite 200 <br /> CORONA, California 92882 #57 - FRENCH CAMP BATCH PLANT SCALE 1 ” = 50' <br /> AMP SERVICE WILL BE AVAILABLE. <br /> (s5-, ) 493-6500 10500 HARLAN RD . DATE 09130/19 <br /> 2. ALL TRUCKS TO USE RUMBLE GRATE AT EXIT BEFORE (� <br /> ENTERING THE STREET. E 0 1 i <br /> DWG. <br /> Michael Orozco 0 RCE 61055 0 bT 12,31120 D::TE SITE PLAN / TITLE SHEET SHEET 1 0f 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.