Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> burrow can be destroyed. <br /> Cultural Resources <br /> 4.7-1 a: Unanticipated Discovery Action: Project Archaeologist San Joaquin County NRHP,CRHR <br /> If subsurface deposits believed to be cultural Implement <br /> or human in origin are discovered during unanticipated <br /> construction,then all work must halt within a discoveries <br /> 100-foot radius of the discovery.A qualified protocol. <br /> professional archaeologist, meeting the Initials Initials <br /> Secretary of the Interior's Professional Timing: <br /> Qualification Standards for prehistoric and During construction <br /> historic archaeology,shall be retained to ground <br /> evaluate the significance of the find,and shall disturbance. <br /> have the authority to modify the no-work radius Date Date <br /> as appropriate,using professional judgment. <br /> The following notifications shall apply, <br /> depending on the nature of the find: <br /> • If the professional archaeologist <br /> determines that the find does not <br /> represent a cultural resource,then <br /> work may resume immediately and <br /> no agency notifications are <br /> required. <br /> • If the professional archaeologist <br /> determines that the find does <br /> represent a cultural resource from <br /> any time period or cultural affiliation, <br /> then he or she shall immediately <br /> notify the County and lead federal <br /> agency.The agencies shall consult <br /> on a finding of eligibility and <br /> implement appropriate treatment <br /> measures if the find is determined to <br /> be eligible for inclusion in the NRHP <br /> or CRHR.Work cannot resume <br /> Section 1.0 Introduction 14 August 2022 <br />