Laserfiche WebLink
April 17, 2019 <br /> BGG Job No. G001.05 <br /> the bottom of the dispersal system to ground water(see Table 1). Ground water is anticipated to be <br /> encountered from 35 to 45 feet bgs at the site; as such, modifications to standard septic systems <br /> should not be required. <br /> Discussion of Septic System Sizing <br /> Septic system construction utilizing leach lines should follow the San Joaquin County On-Site <br /> Wastewater Treatment Systems Standards (2017) where applicable. <br /> BAEZ GEOTECHNICAL GROUP Soil Suitability Study and Nitrate Loading Study-DFV Guard Station Page 6 <br />