Laserfiche WebLink
KLE/NFELOER <br /> Bright ft.0.Bight Salut— <br /> 7 LIMITATIONS <br /> The conclusions and recommendations of this report are for design purposes for the proposed <br /> new Ag farm complex for Escalon High School project as described in the text of this report. The <br /> conclusions and recommendations in this report are invalid if: <br /> • Occupancy or wastewater loading increases from those assumed herein <br /> • The report is used for adjacent or other property <br /> • Any other change is implemented which materially alters the project from that proposed <br /> at the time this report was prepared. <br /> The scope of services was limited to groundwater sampling and percolation testing on the subject <br /> property. It should be recognized that definition and evaluation of subsurface conditions are <br /> difficult. Judgments leading to conclusions and recommendations are generally made with <br /> incomplete knowledge of the subsurface conditions present due to the limitations of data from <br /> field studies. <br /> Kleinfelder offers various levels of investigative and engineering services to suit the varying needs <br /> of different clients. Although risk can never be eliminated, more detailed and extensive studies <br /> yield more information, which may help understand and manage the level of risk. Since detailed <br /> study and analysis involve greater expense, our clients participate in determining levels of service <br /> which provide information for their purposes at acceptable levels of risk. The client and key <br /> members of the design team should discuss the issues covered in this report with Kleinfelder so <br /> that the issues are understood and applied in a manner consistent with the owner's budget, <br /> tolerance of risk, and expectations for future performance and maintenance. <br /> Recommendations and/or conclusions contained in this report are based on our field <br /> observations, reviewed subsurface explorations and percolation test data, and our present <br /> knowledge of the proposed construction. It is possible that soil or groundwater conditions could <br /> vary between or beyond the points explored. If soil or groundwater conditions are encountered <br /> during construction that differ from those described herein, the client is responsible for ensuring <br /> that Kleinfelder is notified immediately so that we may reevaluate the recommendations of this <br /> report. If the scope of the proposed construction changes from that described in this report, the <br /> 20200144.002A/ST01 9R101 556 Page 12 of 14 September 24, 2019 <br /> ©2019 Kleinfelder www.kleinfelder.com <br />