Laserfiche WebLink
E Date Begin-End: 8/12/2019 Drilling Company: V&W Drilling PERCOLATION TEST HOLE LOG PT-1 <br /> c� <br /> Logged By: AA Drill Crew: Anger/Kenny <br /> m Hor:Vert.Datum: Not Available Drilling Equipment: CME-75 Hammer Type-Drop: 140 Ib.Auto-30 in. <br /> a <br /> Plunge: -90 degrees Drilling Method: Hollow Stem Auger <br /> Q Weather: Sunny/Clear Exploration Diameter:6 in.O.D. <br /> FIELD EXPLORATION LABORATORY RESULTS <br /> N <br /> O p <br /> a m .L= V CL a o o aXi rn Zn_ a� o o _ o CO <br /> a N c N C d ~ <br /> O F h3 a sk E= CM 01 �c my <br /> a o oz o)� Z5v v v Z ° m <br /> Q) m m � m a�Z U)) >, mo i' m m a, mz vE <br /> o C7 Lithologic Description U)z U) H a X ZD u> U o a- a. :D a Q Ir <br /> Silty SAND(SM):low plasticity,dark reddish 1 <br /> brown,moist,fine sand <br /> The percolation test hole was terminated at GROUNDWATER LEVEL INFORMATION: <br /> approximately 3 ft.below ground surface. The Groundwater was not observed during drilling or after completion. <br /> percolation test hole was backfilled with GENERAL NOTES: <br /> excavated material on August 12,2019. <br /> 5- <br /> z <br /> O <br /> Y <br /> U <br /> O <br /> H <br /> N <br /> Uj <br /> W <br /> F- <br /> J <br /> LL <br /> W <br /> U <br /> LL <br /> LL <br /> 0 <br /> 0 <br /> J <br /> _J <br /> O <br /> F <br /> a <br /> 10- <br /> < <br /> w <br /> o C <br /> o � <br /> Z <br /> o � <br /> o mi <br /> N J <br /> 2 Y <br /> m � <br /> � m <br /> Z J <br /> Z U <br /> U � <br /> W o <br /> W }I <br /> acr <br /> tt <br /> m <br /> J <br /> ZI <br /> Z_ <br /> 01 <br /> K <br /> Q <br /> O ❑ <br /> PROJECT No.: PERCOLATION TEST HOLE LOG PT-1 FIGURE <br /> EEJ 20200144.002A <br /> Y <br /> s~ KL E/NFEL SER DRAWN BY: GG Escalon Ag Farm Complex A-3 <br /> W \\ Bright People.Right Solutions. CHECKED BY: AA 17950 S Van Allen Road <br /> Escalon,California <br /> z z DATE: 8112/2019 PAGE: 1 Of 1 <br /> m m <br />