Laserfiche WebLink
PA-1900083($A)(Referral), SU0.01 2538 Page 2 of 3 <br /> 20679 E..Hwy. 1.20, Escalon September 19,2019 <br /> D. The onsite wastewater treatment system (OWTS) shall be designed to:receive.all domestic <br /> sewage and wastewater from the property.. Only domestic sewage is allowed to discharge <br /> intotheOWTS, No basement footing or surface drainage or discharge:from water softener, <br /> iron fit ter, pool filters, or water treatment systems shall be permitted to enter any part of the <br /> OWTS. (,San Joaquin County OWTS Standards 1.10.1) <br /> a. 'Prohibited discharges into OWTS include: automobile and garage waste, -storm <br /> drainage, solvents and toxics., solids,. garbage,-kitchen wastewater from restaurant or <br /> bar,.air conditioners, hazardous wastes, backwash, truck terminal.wastes,.recreational <br /> vehicle holding tank waste, industrial and manufacturibg waste,, andfood processing <br /> wastes.. (San Joaquin County Development Title, Section 9-1110,7 and San Joaquin <br /> County OWTS 1.14.). <br /> E. Applicant will need to. get written approval from a public entity for the disposal of winery <br /> wastewater by removal of winery-wastewater to an offsite disposal facility or from the Central <br /> Valley Regional Water Quality Control Board for discharge to land. That written approval <br /> shalt be presented to the Environmental Health Department prior to issuance of building <br /> permit andlorfinal occupancy approval (San Joaquin County Development Title: Section 9- <br /> 1125-5). <br /> F. Open,. pump, and backfill the septic tank, seepage pit or excavation under permit and <br /> inspection by the Environmental Health Department (San Joaquin County Development <br /> Title, Section 9-1110..3&9-1110.4). <br /> G. Applicant shall-contact Robert McClellon, Program Coordinator,, Small Public Water System <br /> Program, at (20.9) 468-0332, to determine if the existing well can be permitted as a public <br /> water system prior to issuance of building permits. if a public:water system is required, <br /> applicant shall submit Small Public Water System preliminary technical report to, the <br /> California State Water Resources Control Board, Division of Drinking Water(Water Board) <br /> atleast six months before initiating construction of any water related improvement, as <br /> defined.The issuance ofa.permit to operate a small public watersystern­by the local primacy <br /> agency (EHD) is prohibited without the concurrence of the Water Board. Please contact <br /> Michelle Frederick by emaii.at.michelle..frederkk(cD-waterboar-ds-ca. or by phone at(707) <br /> 576-2731 :at the;Water.Board concerning the requirements for,preliminary technical -report <br /> submittal prior to issuance of buildingpermitsI <br /> If the Water Board determines that an onsitewell shall be used as the potable water source, <br /> a permit application to operate: Small. Public Water System shall be submitted tothe EHD <br /> for approval prior to issuance of buiiding permits. To issue a permit to operate, concurrence <br /> from the Water Board is required, A yearly permit to operate a public water system will be <br /> required by.the EHD priorto sign off of the certificate of final occupancy. (San.Joaquin County <br /> Development Title, Section 9-1120.2 and <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable, drinking water in accordance with San <br /> Joaquin-County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C,R.,.Title 22, <br /> and Health and Safety Code, Section 116525 116570. <br />