Laserfiche WebLink
i <br /> -2- <br /> Community Development Department <br /> PA-1900201 (SA) <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> 7. Pen-nit Registration Documents(PRD's shall be filed with the State Water Resources Control Board <br /> (SWRCB)to comply with the State"General Permit for Storm Water Discharges Associated with <br /> Construction Activity".The Waste Discharge Identification(WDID)Number issued by SWRCB shall <br /> be submitted to the Department of Public Works for the file.Contact SWRCB at(916)341-5537 for <br /> further information.Coverage under the SWRCB General Construction Permit Order 2009-0009- <br /> DWQ shall be maintained throughout the duration of all phases of the project. <br /> AC:CH <br /> i <br /> I <br /> 1 <br /> 1 <br />