Laserfiche WebLink
Department of Public Works <br /> SAN JOAQUIN . <br /> COUNTY Kris Balaji,Director of Public Works <br /> w Fritz Buchman,Deputy DirectorlDevelopment <br /> Creotness grows here. " � AlexChetleY,Interim Deputy Din:ctorlEn9meerin <br /> 9Yom � YOU <br /> Jim Stone,Deputy Director/Operations <br /> September 16,2019 Kristi Rhea,Manager of Strategic Initiatives <br /> MEMORANDUM <br /> "C rVE � <br /> 4..3 <br /> TO: Community Development Department 41 � 7 2019 <br /> CONTACT PERSON: Giuseppe Sanfilippo <br /> San Joo,��.13.71 COuz�ty <br /> FROM: Awni Taha,Interim Engineering Services Manager A-C Community Development <br /> Development Services Division <br /> SUBJECT: PA-1900117;A Site Approval application to establish agricultural truck parking in two <br /> (2)phases over five(5)years on an 8.61 acre parcel.Phase One,with building permits to <br /> be issued within 18 months, includes the establishment of truck parking for a maximum <br /> of two(2)trucks and four(4)trailers.Phase Two,with building permits to be issued <br /> within five(5)years,includes the construction of a 2,400 square foot accessory structure <br /> for maintenance and repair of the permitted trucks and trailers; located on the southwest <br /> comer of South Austin Road and West Ripon Road,west of Ripon. <br /> (Supervisorial District 5) <br /> PROPERTY OWNER: Bikramjeet Singh APPLICANT: Luis Corona <br /> ADDRESS: 24061 S.Austin Road,Ripon APN: 257-240-35 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> South Austin Road has an existing and planned right-of-way width of 60 feet. <br /> West Ripon Road has an existing right-of-way width of 60 feet and a planned right-of-way width of <br /> 84 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> C Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />