■ S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> ` K San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Giuseppe Sanfilippo,San Joaquin County, Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: July 3,2019 <br /> Local Jurisdiction Project Title: PA-1900117(SA) <br /> Assessor Parcel Number(s): 257-240-35 <br /> Local Jurisdiction Project Number: PA-1900117(SA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Multi-Purpose Open Space and Urban Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Sanfilippo: <br /> SJCOG, Inc. has reviewed the application referral for PA-1900117 (SA). This project consists of a Site Approval <br /> application to establish an agricultural truck parking pursuant to Development Title Section 9-605.6 (f) in two (2) phases <br /> over five (5) years on an 8.61 acre parcel. Phase One, with building permits to be issued within 18 months, includes the <br /> establishment of truck parking for a maximum of two (2) trucks and four (4) trailers. Phase Two, with building permits to <br /> be issued within five (5) years, includes the construction of a 2,400 square foot accessory structure for maintenance and <br /> repair of the permitted trucks and trailers. The property is accessed from South Austin Road and utilizes an onsite well, <br /> septic system, and storm drainage. The project site is on the southwest corner of South Austin Road and West Ripon <br /> Road, west of Ripon (APN/Address: 257-240-36/24061 South Austin Road, Ripon). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sjcog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title,or <br />