My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
2200 - Hazardous Waste Program
>
PR0514024
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 2:17:49 PM
Creation date
11/19/2019 2:04:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514024
PE
2220
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
01
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
400 <br />V. CLOSURE <br />Pa <br />Closure. <br />The owner or operator shall close his facility in a manner that: <br />(a) minimizes the need for further maintenance, and (b) controls, <br />minimizes or eliminates, to the extent necessary to protect human <br />health and the environment, post -closure escape of hazardous waste, <br />hazardous waste constituents, leachate, contaminated rainfall, or <br />waste decomposition products to the ground water, or surface waters, <br />or to the atmosphere. <br />Closure plan and amendment of plan. <br />(a) The owner or operator shall have a written closure plan. <br />This plan shall be subject to approval by the California <br />Regional Water Quality Control Board and shall be kept at <br />the facility. This plan shall identify the steps necessary <br />to close the facility completely at any point during its <br />intended life and at the end of its intended life. The <br />closure plan shall include, at least: <br />(1) A description of how and when the facility will be parti- <br />ally closed, if applicable, and ultimately closed. The <br />description shall identify the maximum extent of the <br />operation which will be unclosed during the life of the <br />facility, and how Item 1 and other applicable conditions <br />of this document will be met; <br />(2) An estimate of the maximum inventory of wastes in storage <br />or in treatment at any given time during the life of the <br />facility; <br />(3) A description of the steps needed to decontaminate facility <br />equipment during closure; and <br />(4) A schedule for final closure which shall include, as a <br />minimum, the anticipated date when wastes will no longer <br />be received, the date when completion of final closure <br />is anticipated, and intervening milestone dates which <br />will allow tracking of the progress of closure. (For <br />example, the expected date for completing treatment or <br />disposal of waste inventory shall be included, as must the <br />planned date for removing any residual wastes .from storage <br />facilities and treatment processes.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.