Laserfiche WebLink
400 <br />V. CLOSURE <br />Pa <br />Closure. <br />The owner or operator shall close his facility in a manner that: <br />(a) minimizes the need for further maintenance, and (b) controls, <br />minimizes or eliminates, to the extent necessary to protect human <br />health and the environment, post -closure escape of hazardous waste, <br />hazardous waste constituents, leachate, contaminated rainfall, or <br />waste decomposition products to the ground water, or surface waters, <br />or to the atmosphere. <br />Closure plan and amendment of plan. <br />(a) The owner or operator shall have a written closure plan. <br />This plan shall be subject to approval by the California <br />Regional Water Quality Control Board and shall be kept at <br />the facility. This plan shall identify the steps necessary <br />to close the facility completely at any point during its <br />intended life and at the end of its intended life. The <br />closure plan shall include, at least: <br />(1) A description of how and when the facility will be parti- <br />ally closed, if applicable, and ultimately closed. The <br />description shall identify the maximum extent of the <br />operation which will be unclosed during the life of the <br />facility, and how Item 1 and other applicable conditions <br />of this document will be met; <br />(2) An estimate of the maximum inventory of wastes in storage <br />or in treatment at any given time during the life of the <br />facility; <br />(3) A description of the steps needed to decontaminate facility <br />equipment during closure; and <br />(4) A schedule for final closure which shall include, as a <br />minimum, the anticipated date when wastes will no longer <br />be received, the date when completion of final closure <br />is anticipated, and intervening milestone dates which <br />will allow tracking of the progress of closure. (For <br />example, the expected date for completing treatment or <br />disposal of waste inventory shall be included, as must the <br />planned date for removing any residual wastes .from storage <br />facilities and treatment processes.) <br />