Laserfiche WebLink
5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone (� <br /> Address City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored on i <br /> te prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Sto age&Disposal Facility: <br /> Hauler Name P ne (_� Hauler Reg# <br /> Address City Zip <br /> Permitted Disposal Site <br /> 1 <br /> 6. a. Describe the meth at will be utiliz d to pu a an or ine the piping: <br /> b. Piping Hauler: <br /> Name Phone ( ) <br /> Address City Zip <br /> Hauler Registration#(if huled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone(� <br /> Address City Zip <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 7. Is the sampling firm an independent third party from the contractor? YES [] NO [] <br /> a. Identify sampling firm: <br /> Name Phone(_) <br /> Address City Zip <br /> b. Identify laboratory performing analysis: <br /> Name Phone(� <br /> Address City Zip <br /> 8. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br /> 9. a. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone(� <br /> Address City Zip <br /> b. If soil is not to be hauled, describe what will be done with it: <br /> 4 <br />