My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2009 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:35:07 PM
Creation date
11/19/2019 2:19:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2011
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification Form 'dendum for Vacuum/Pressure Interstitial` ors LG 163-1,Enc.II <br /> I. Results of Vacuum/Pressure Monitoring Equipment Testing <br /> This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of <br /> this form must be included with the Monitoring System Certification Form, which must be provided to the tank <br /> system owner/operator. The owner/operator must submit a copy of the Monitoring System Certification Form to the <br /> local agency regulating UST systems within 30 days of test date. <br /> Manufacturer: — Veeder Root Model: 0330020-496 System Type: ❑ Pressure;® Vacuum <br /> Sensor ID <br /> Component(s)Monitored by this Sensor: 91 PRODUCT LINE S/N-10460002 <br /> S-5 <br /> Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; El Fail <br /> S-6 Component(s)Monitored by this Sensor: 91 VENT LINE S/N-10198 <br /> —" Sensor Functionality Test Result: ®Pass; ❑ Fail Interstitial Communication Test Result: ® Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> _ Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> How was interstitial communication verified? <br /> ❑ Leak Introduced at Far End of Interstitial Space;' ® Gauge; ® Visual Inspection; ❑ Other(Describe in Sec. J, below) <br /> Vacuum was restored to operating levels in all interstitial spaces: ®Yes ❑No(If no, describe in Sec.J, below) <br /> J. Comments: REPLACED TWO VACUUM SENSORS, S-5 AND S-6, REPLACED HOSE AND <br /> RECONNECTED ALL WIRING IN JUNCTION BOX. TESTED FUNCTIONALITY OF SENSORS AND <br /> PERFORMED EVAC HOLD, VERIFIED HIGH LIQUID ALARM AND PLLD SHUTDOWN...ALL OK <br /> I�Ws <br /> ects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br /> sbeen demonstrated to be communicating throughout the interstice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.