Laserfiche WebLink
F. In-Tank G&ll iztg STS Equipment: A Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or STR equipment is installed. <br /> This section Vist be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the r UowlnR checklist; <br /> VU0 <br /> No* Has all.input wiring been inspcctrd for proper entry and termination,including t✓sting for ground Davits? <br /> Na* Wore all tank gauging probcs Yisually inspected for damago and residue buildup?No, Was accuracy of system product level readings tested? <br /> No* Was accuracy of system water level readings tested?NO` Were all probes reinstalled properly?No'` Were all hams on the equipment manufacoxar's maintenance checklist comlpletcd? <br /> *In the Section H,below,describe how and when these deficietccles were or will be corrected, <br /> G. Line Leak Detectors(LLD): ❑ acck this box if LLDs are not installed. <br /> Com lete the foUowm' checklist: <br /> Yes ❑ Na* For equipment starUlip or annual equipment certification, was a leak simulated to vraify LLD performance? <br /> 0 NIA {Check all shat apply) Simulated lcakrate: n 3 g.p.h.; ❑0.1 g.p h; ❑0.2 g p.h, <br /> Yes ❑ No* Wrm all LLUs eonfrrmod operational and accurate within regulatory requiremmits? <br /> $ Yes ❑ No's Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No's For me <br /> LLDs,does the LLD rest;iet product flow if it dctccts a leak'1 <br /> 0:NfA <br /> Yes ❑ Noy' For electronic LLDs,docs tho turbine automatically shut off if the LLD dotccts a leak? <br /> ❑ NIA �. <br /> Yes ❑ No* For electronic'LLDs,does file turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A I or discomv;tad? <br /> la Yes ❑ Noy Ivocc Lronic LLDs,does Lha turbine auiomadcally shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fa is a test? <br /> W-Ycs ❑ No* Por electronic l.Llas,have all aectssd to wiritrg comoctions been visually inspected? <br /> ❑ NIA <br /> Yes C1 No 'Were all items on the equipment manufacturer's maintenan:..e choddist completed? <br /> In the sectlon H,below,describe how and when these deficiencies were or will be corrected, <br /> ' K. Comuments: <br /> , <br /> Page 3 of 3 tl�nl <br />