Laserfiche WebLink
RECEIVED <br /> JA p 1 2018 <br /> D. Results of Testing/Servicin EWRONMENTAL <br /> Software Version Installed: ^ql T�` nP`?,3PTNAENT <br /> Complete the following checklist: <br /> X Yes No' Is the audible alarm operational? <br /> X Yes No' Is the visual alarm operational? <br /> X Yes No' Were all sensors visually inspected,functionally tested.and confirmed operational? <br /> X Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> X Yes No' If alarms are relayed to a remote monitoring station.is all communications equipment(e g.modem)operational? <br /> X N/A <br /> X Yes No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> NIA detects a leak,fails to operate,or is electrically disconnected? If yes.which sensors initiate positive shut-down? (Check all that apply) <br /> X Sump(Trench Sensors, Dispenser Containment Sensors Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? X Yes, No. <br /> X Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e no mechanical overfill prevention <br /> N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so.at what percent <br /> of tank capacity does the alarm trigger? 95 <br /> X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes. or other equipment replaced and list the <br /> Yes' manufacturer name and model for all replacement parts in Section E,below. <br /> X Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product. X Water. If <br /> es,describe causes in Section E.below. <br /> X Yes No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes No' Is all monitoring equipment operational per manufacturer's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: REMOVED WATER FROM ALL SUMPS THAT HAD <br /> WATER. <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> ?l?1107 <br />