Laserfiche WebLink
Monitoring System Certification 11��,' C E IVt <br /> E D <br /> APR JU <br /> 1). Results of Testing/Servicing <br /> ENVIPIONMENTAL <br /> Software Version Installed: HEA.I Ty DE RARTMENT <br /> Com lete the folloivin T checklist: <br /> ® Yes ❑ No* Is the audible alarm operational'.' <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected. functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g.. modem) <br /> ❑ N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected`' If yes: -which sensors initiate <br /> positive shut-down? (Check all that apph) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yep ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 95% <br /> ❑ Yes* ® No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E.below. <br /> i ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appltq <br /> ❑ Product; ❑ Water. If yes,describe causes in Section E.below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports. if applicable <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> 1 N-030—3;6 ++H++.uniduc..ur ReN.0ull 7/t18 <br />