My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:36:09 PM
Creation date
11/19/2019 2:48:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box iftank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly'? <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H,below,describe how and when these deficiencies were or N ill he corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the foliowin checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance:' <br /> [] N/A (Check all that apph) Simulated leak rate: ®3 g.p.h.; [10.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated'? <br /> ❑ Yes [] No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> [] N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ® Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed'? <br /> * In Section H.below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: _ <br /> OM -, <br /> Page 3 of 4 <br /> t'N-036-5/6 -,%%%%.unidocs.org Re-..01/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.