Laserfiche WebLink
BRAWO• SWRCB Requirement for VPH Communication <br /> PROBLEM SOLVED <br /> TOP OFF METHODAtmosphere <br /> U DC'S — r <br /> Manometer <br /> e <br /> 1. Locate the primary manometer <br /> and remove the cap. Primary Manometer <br /> r Electronic Liquid <br /> Level Sensor <br /> 2. To make sure there is communication in the <br /> UDC add Bravo interstitial fluid to the primary <br /> manometer. o ti' Fluid Level <br /> As interstitial fluid is added to the primary <br /> G � <br /> manometer, the fluid level in the atmospheric <br /> manometer should rise. — <br /> -1 <br /> 3. Once the test has concluded secure the cap backon the manometer. <br /> Interstitial fluid may rise out of the <br /> manometer after the communication <br /> test has been performed due to the <br /> pressure over time. This will depend <br /> on the level of the interstital fluid <br /> and temperature change. <br /> i� <br /> If manometers are completely filled with interstitial fluid, <br /> use the following, alternative testing method. <br /> 2929 Vail Avenue,Commerce CA. 90040 1 Office: 323.888.4133 Fax: 323.888.4123 www.sbravo.com <br /> 3. <br />