Laserfiche WebLink
, s <br /> San Joaquin Count FILE COPY <br /> q Y <br /> Environmental Health Department DIRECTOR <br /> Q: <br /> i 1868 E Hazelton Avenue Linda Turkatte, REHS <br /> Stockton, California 95205 PROGRAM COORDINATORS <br /> : Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> cqC!F ORa`P Website: www.sjcehd.com Kasey Foley,REHS <br /> 209 468-3420 Adrienne Ellsaesser,REHS <br /> Phone: <br /> ( ) Rodney Estrada, REHS <br /> Fax: (209)464-0138 <br /> March 10, 2015 <br /> DONLEE PUMP COMPANY <br /> 2825 RAILROAD AVE <br /> CERES, CA 95307 <br /> Re: CRUISERS MANTECA#29 SR0071527 <br /> 1137 W LATHROP RD <br /> MANTECA, CA 95336 <br /> The San Joaquin County Environmental Health Department(EHD) has completed the review of the <br /> application for a permit to replace a Veeder Root vacuum sensor kit assembly(VR 330020-463) in diesel <br /> STP sump and pertinent communication cable from the Veeder Root monitoring panel to the turbine <br /> piping sump(diesel tank)on the underground storage tank(UST)system at the above noted address. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at(209) 953-7699 to arrange the following appointments (a 48-hour notice is <br /> required for inspection appointments). <br /> • Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br /> and the Health &Safety Code. If it is determined that a cold start is necessary, a copy of the <br /> alarm history shall be printed prior to performing the"cold start" of the monitoring system and <br /> made available at the time of EHD inspection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> 4. If concrete will be broken near the tank, a secondary containment test must be performed on the <br /> tank once concrete is poured in accordance with the manufacturer's guidelines. <br />